Social networks:
Construction of lighting networks on the M-12 Stryi-Ternopil-Kirovohrad-Znamianka highway
Details of the completed project
Department of Municipal Economy and Improvement of Vinnytsia City Council
Against the backdrop of growing problems in urbanized space, the idea of creating cities that are comfortable for living, friendly to people, regardless of their socio-economic or physical and biological characteristics, is gaining new meaning. An example of such a project is Zamostyanska Street in Vinnytsia.
98 contact network poles were installed (own production).
The street lighting network was reconstructed by replacing outdated lamps with energy-saving (LED) lamps – 164 units of TM Schréder, which gave an economic effect – a 40% reduction in power consumption.
12.08.2023 - 11.01.2024
- Power: 375 kW
- Area: 450 м2
- The volume of annual electricity generation: 494507.9 kW/year
- Number and capacity of solar panels: 1325 pcs x 280 W
- The number and power of Fronius inverters: 9 pcs. x 25 kW
We have all the necessary licenses
Certificate of compliance with DSTU ISO 9001:2015 Energy efficiency certificate Certificate of conformity of electrical equipment to DSTU EN 61730 Green tariff certificate Certificate of environmental compliance Certificate for installation and service work Certificate of conformity of components (e.g. TÜV, CE)Our contacts
Office hours:
Monday – Friday: 09:00 – 18:00