Construction of the road lighting network Highway M-12 Stryi–Ternopil–Kropyvnytskyi–Znamianka
Details of the completed project
Cloverleaf Interchange – Intersection of Highway M12 (Stryi – Ternopil – Kropyvnytskyi – Znamianka) and Highway M30 (Stryi – Izvaryne)
This interchange lies along Ukraine’s longest highway route, the M30, dedicated to the 30th anniversary of Ukraine’s Independence in 2021. It connects with Highway M12, forming a crucial logistical artery across the country.
Lighting quality for this infrastructure was a top priority during reconstruction.
The total length of the M12 highway is 746.2 km. Along this section, 167 galvanized 12-meter lighting poles were installed, using specially designed anchor foundations.
For illumination, we used Schreder Avento LED luminaires —
-
167 units of 108W, and
-
167 units of 142W,
mounted on double-arm brackets with a carefully calculated tilt angle to ensure the entire roadway is evenly lit.
This engineering solution leaves no room for darkness, ensuring safe and comfortable driving conditions day and night.
We have all the necessary licenses
Certificate of compliance with DSTU ISO 9001:2015 Energy efficiency certificate Certificate of conformity of electrical equipment to DSTU EN 61730 Green tariff certificate Certificate of environmental compliance Certificate for installation and service work Certificate of conformity of components (e.g. TÜV, CE)Our contacts