Project:

Construction of lighting networks for the M-12 Stryi-Ternopil-Kirovohrad-Znamyanka highway.

Customer:

Ukravtodor – year 2019.

Project details:

More than 2000 galvanized metal poles have been installed.

8 km of cable network was built.

9 transformer substations were installed and connected.

More than 3,200 Schreder LED luminaires have been installed.

Duration of construction – 6 months.

Priority in the organization of lighting of roadways – ensuring road safety. As part of this project, our company acted as contractor. The main equipment (poles, lamps, cable) was installed.

We offer technical solutions that make new light sources an effective alternative to traditional sources. Solutions that give more light and more flexibility, reduce energy consumption and overall lighting control costs.

Lighting cannot be an item of budget savings, because the damage from traffic accidents significantly exceeds the cost of lighting.